Wiki Article
Luyang station
Nguồn dữ liệu từ Wikipedia, hiển thị bởi DefZone.Net
Platform | |||||||||||
| Chinese name | |||||||||||
| Simplified Chinese | 潞阳站 | ||||||||||
| Traditional Chinese | 潞陽站 | ||||||||||
| |||||||||||
| General information | |||||||||||
| Location | North side of the intersection of Jianyun Road (减运路) and Luyang Street (潞阳大街)[1] Lucheng Town, Tongzhou District, Beijing China | ||||||||||
| Coordinates | 39°53′15″N 116°45′02″E / 39.88749°N 116.75064°E | ||||||||||
| System | Beijing Subway station | ||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
| Line | Line 6 | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | December 27, 2025 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Luyang station (Chinese: 潞阳站; pinyin: Lùyáng zhàn) is a station and the eastern terminus of Line 6 of the Beijing Subway.[2] It is located under the north side of the intersection of Jianyun Road and Luyang Street in Lucheng Town, Tongzhou District in Beijing. It opened on December 27, 2025.[3] It currently serves as Beijing Subway's easternmost station before the opening of Line 22.
Station features
[edit]The station has an underground island platform.
-
Concourse
Exits
[edit]The station has 3 exits, lettered B, C1 and C2. Exit B1 is accessible via an elevator.
-
Exit A
-
Exit B1
-
Exit B1 (elevator exit)
-
Exit B2
History
[edit]- On November 8, 2021, the Beijing Infrastructure Investment Co., LTD released the first public notice of the environmental impact assessment for the Line 6 Southern Extension Project.[4]
- On May 30, 2022, the China Academy of Railway Sciences released the second public announcement of the environmental impact assessment of the southern extension section of the Phase 2 project of Line 6.[5][6]
- On August 30, 2022, the construction of the southern extension of Line 6 Phase 2 started.[2]
- On January 3, 2025, the Beijing Municipal Commission of Planning and Natural Resources issued a “Public Notice on the Naming Plan for the Phase 2 (Southern Extension) station of Metro Line 6”, proposing to officially name the station Luyang station;[7] the place name announcement issued on April 8 officially confirmed the name.[1]
Future Development
[edit]A southern extension to Tongzhou Dagantang is under planning.[8] It is also known as Hulang Lu station (Chinese: 胡郎路站; pinyin: Húláng Lù zhàn; lit. 'Hulang Road station'), although Hulang Road is located closer to Luyang than Tongzhou Dagantang.
References
[edit]- ^ a b 户力平 (Hu Liping) (2025-08-26). "通州何以称"潞阳"" [Why is Tongzhou also called "Luyang"].
2000年兴建东六环路时,在通州城区东部修建了一座横跨北运河的特大桥,因"潞阳"为通州旧称,故命名为"潞阳桥",由此使一个消失数百年的通州别称得以恢复。2020年在通州城区东部新辟道路,也因"潞阳"为通州旧称,而命名为"潞阳大街",成为北京城市副中心东南部东西走向的主干道。2023年5月启动地铁6号线南延工程,因在潞城镇东小营东南侧设站,故施工站名为"东小营南站"。因其地处潞阳大街东端北侧,2025年4月8日北京市规划和自然资源委员会将其命名为"潞阳站"。
- ^ a b "6号线南延段启动建设 计划于2025年底建成通车". 2022-08-31. Archived from the original on 2022-09-01. Retrieved 2022-09-01.
- ^ "地铁6号线南延段开建!延长2公里,增设东小营南站". 2023-01-14.
- ^ "北京地铁6号线南延工程环境影响评价第一次公示". 2021-11-08. Archived from the original on 2022-01-05. Retrieved 2021-11-16.
- ^ "北京地铁6号线二期(南延段)工程环境影响评价第二次公示". 2022-05-30. Archived from the original on 2022-05-31. Retrieved 2022-05-31.
- ^ "北京地铁6号线二期(南延段)工程环境影响报告书(征求意见稿).pdf" (PDF). Archived from the original (PDF) on 2022-05-31. Retrieved 2022-05-31.
- ^ "关于轨道交通6号线二期(南延段)车站命名预案的公示(公示期限7天)". 2025-01-03. Archived from the original on 2025-01-06.
本次新命名车站1座,现提出命名预案如下:潞阳站。位于通州区潞城镇、北运河北侧,紧邻潞阳大街。北运河原称潞水,水北为阳,故称潞阳站。
- ^ "地铁6号线".
市规划和自然资源委员会回复:经核实,根据北京市政府批复的《北京市轨道交通线网规划(2020年-2035年)》,地铁6号线西起金安桥站,东至通州大甘棠。地铁6号线一期工程(海淀五路居站至草房站)于2012年12月30日开通运营,6号线二期工程(草房站至潞城站)、6号线西延工程(海淀五路居站至金安桥站)于2014年12月30日开通运营,目前6号线二期南延(潞城站至东小营南站)为在建项目