Zapote station

Nguồn dữ liệu từ Wikipedia, hiển thị bởi DefZone.Net

Zapote
Aerial view of the site of the Zapote station and satellite depot in 2024
General information
LocationBarangay Zapote V, Bacoor, Cavite
Coordinates14°28′19″N 120°58′03″E / 14.472026°N 120.96748°E / 14.472026; 120.96748
SystemManila Light Rail Transit System
Owned byLight Rail Transit Authority
LineLine 1
Construction
Structure typeAt-grade
History
Opening2031
Services
Preceding station LRTA_Logo
Manila LRT
Following station
Las Piñas LRT Line 1 Niog
Terminus
Location
Map

Zapote station is a proposed Light Rail Transit (LRT) station on Line 1 of the LRT in Bacoor, Cavite. The station will be located at the line’s Zapote Satellite Depot. Unlike other stations on Line 1, Zapote station will be constructed at grade. It is part of the LRT-1 South Extension Project and is expected to be the first LRT-1 station located outside Metro Manila.

History

[edit]

Zapote station was first planned as part of the Line 1 South Extension plan, which calls for a mostly elevated extension of approximately 11.7 kilometers (7.3 mi). The extension will have eight passenger stations, with an option for two future stations (Manuyo Uno and Talaba).[1] The project was first approved on August 25, 2000, and the implementing agreement was approved on January 22, 2002.[2] However, construction of the extension was repeatedly delayed, and the project was eventually shelved.

Plans for the southern extension were revived as early as 2012 during the Benigno Aquino III administration and were expected to begin construction in 2014, but were delayed due to right of way issues. These issues were resolved in 2016, and the project broke ground on May 4, 2017.[3] Construction work on the South Extension began on May 7, 2019, after right-of-way acquisitions were cleared.[2]

On November 15, 2024, Phase 1 of the LRT Line 1 Extension, which runs between Redemptorist and Dr. Santos, was inaugurated; LRMC management announced that commercial operations would begin the following day.[4][5] Phases 2 and 3 are expected to begin operations by 2031, as challenges—particularly delays in right-of-way acquisition—have hindered their completion.[6]

See also

[edit]
[edit]
  • Media related to Access Road (Zapote station) at Wikimedia Commons

References

[edit]
  1. ^ "Project Update: The Line 1 South Extension Project". Light Rail Transit Authority. Archived from the original on April 30, 2006. Retrieved March 25, 2012.
  2. ^ a b Orellana, Faye (May 7, 2019). "Construction of LRT-1 Cavite extension begins". Philippine Daily Inquirer. Retrieved August 9, 2021.
  3. ^ "LRMC breaks ground on LRT-1 Cavite Extension project". Light Rail Manila Corporation. May 4, 2017. Retrieved August 9, 2021.
  4. ^ Gita Carlo, Ruth Abbey (November 15, 2024). "PBBM: 'More reliable' transport with LRT-1 Cavite Extension Phase 1". Philippine News Agency. Retrieved November 15, 2024.
  5. ^ Bajo, Anna Felicia (November 7, 2024). "LRT-1 Cavite Extension Phase 1 partial opening this November —DOTR". GMA Integrated News. Retrieved November 7, 2024.
  6. ^ Rosales, Elijah Felice. "Final leg of LRT-1 extension stalled until 2026". Philstar.com. Retrieved November 16, 2024.