HMAS Supply tī 2022-nî 6-gue̍h.
| |
Li̍k-sú | |
---|---|
Australia | |
Name: | Supply |
Namesake: | HMAS Supply |
Ordered: | 10 March 2016 |
Builder: | Navantia |
Laid down: | 18 November 2017 |
Launched: | 25 November 2018 |
Commissioned: | 10 April 2021 |
Identification: | |
Motto: | Strengthen the Shield |
Nickname(s): | Orca |
Status: | Active |
It-puañ tı̽k-ting | |
Class and type: | Supply-kip replenishment oiler |
Displacement: | 19,500 t (19,200 long tons) full load |
Tsuân-tn̂g: | 173.9 m (570 ft 6 in) |
Tsuân-khuah: | 23 m (75 ft 6 in) maximum |
Draught: | 8 m (26 ft 3 in) |
Propulsion: |
|
Speed: | Over 20 knots (37 km/h; 23 mph) |
Range: | Over 6,000 nmi (11,000 km; 6,900 mi) at 13 knots (24 km/h; 15 mph) |
Complement: | 122 |
Armament: | ?x12.7mm Browning Heavy Machine Gun |
Aircraft carried: | 2 x MH60R |
HMAS Supply (A195) (ing-gú: HMAS Supply (A195); HMAS kiong-ìng-kip iû-liāu póo-kip-kàm (A195)) sī-í Hông-ka hái-kun tsûn-kám HMS Supply lâi hō-miâ ê, sī iû khiā-tī Sepangâ Ferrol ê tsō-tsûn-tshiúñ Navantia uî Au-tsiu hông-ka hái-kun kèn-tsō ê kiong-ìng-kip Iû-liāu póo-kip-kàm ê Siú-kàm . HMAS kiong-ìng-kip iû-liāu póo-kip-kàm sī-í Sepangâ hái-kun ê kiong-ìng-kip iû-liāu póo-kip-kàm Cantabria uî ki-tshóo sóo-lâi kèn-tsō ê. HMAS Supply (A195) tī 2017-nî 11-gue̍h 18-ji̍t hā-suí , pīng tī 2021-nî 4-gue̍h 10-ji̍t tâu-ji̍p sú-iōng.