Wiki Article

Indian Human Spaceflight Programme

Nguồn dữ liệu từ Wikipedia, hiển thị bởi DefZone.Net

Indian Human Spaceflight programme
Gaganyaan astronaut insignia
Program overview
CountryIndia
OrganizationHuman Space Flight Centre (ISRO)
PurposeHuman spaceflight
StatusActive
Programme history
Cost20,193 crore (US$2.1 billion)
Duration2006–present[1]
First flightGaganyaan-1 (Q1 2026)[2]
First crewed flightGaganyaan-4 (NET Q2 2027)[3]
Launch siteSatish Dhawan Space Centre
Vehicle information
Launch vehicle

The Indian Human Spaceflight Programme (or the Gaganyaan programme) is an ongoing project by ISRO to develop the technology needed to launch crewed spacecraft into low Earth orbit.[4]

Before the Gaganyaan programme announcement in August 2018, human spaceflight was not a priority for ISRO, though related technologies have been developed since 2007,[5] and it performed a Crew Module Atmospheric Re-entry Experiment[6] and a Pad Abort Test for the programme.[7][8] In December 2018, the Indian government approved a further 100 billion (US$1.5 billion) for a 7-day crewed flight of 2–3 astronauts.[9][10][11][12] Three uncrewed flights, named Gaganyaan-1, Gaganyaan-2 and Gaganyaan-3 are scheduled to launch in the 2020s, followed by a crewed flight on an HLVM3 rocket.[3][2][13] To date, mission has been postponed several times until all certification requirements are completed.[14][15][16]

If completed successfully, India will become the fourth nation to conduct independent human spaceflight after the Soviet Union (Russia), United States, and China. After conducting the first crewed spaceflights, the agency intends to start a space station programme, crewed lunar landings, and crewed interplanetary missions in the long term.[17][18]

History

[edit]
Patch of Indian Cosmonaut Mission 1 in 1984

Soyuz and early achievement

[edit]

On 3 April 1984, Rakesh Sharma became the first Indian citizen to travel to space on board Soyuz T-11 as part of the Interkosmos programme, visiting Salyut 7.[19] The mission was launched on board a Soviet rocket and was not part of an independent Indian programme, but it became the starting point for India's manned space adventure.

On 9 August 2007, the then Chairman of the ISRO, G. Madhavan Nair, indicated the agency was "seriously considering" the creation of a human spaceflight programme. He further indicated that within a year, ISRO would report on its development of new space capsule technologies.[20] Development of a fully autonomous orbital vehicle to carry a two-member crew into low Earth orbit (LEO) began a few months after that, when the government allocated 95 crore (US$9.9 million) for pre-programme initiatives for 2007 through 2008. A crewed orbital spaceflight would require about 12,400 crore (US$1.3 billion) and a period of seven years of development. The Planning Commission estimated that a budget of 5,000 crore (US$521.6 million) was required for initial work during 2007–2012 for the crewed spaceflight.[5][21] In February 2009, the Government of India authorised the human space flight programme,[22] but fell short of fully funding or creating it.

The trials for crewed space missions began in 2007 with the 600 kg Space Capsule Recovery Experiment (SRE), launched using the Polar Satellite Launch Vehicle (PSLV) rocket, and safely returned to Earth 12 days later. This was followed by the Crew Module Atmospheric Re-entry Experiment and the Pad Abort Test in 2018. This enabled the ISRO to develop heat-resistant materials, technology, and procedures necessary for human space travel.

As per the memorandum of understanding (MoU), Defence Research and Development Organisation (DRDO) will provide support for the programme with critical human-centric systems and technologies like space-grade food, crew healthcare, radiation measurement and protection, parachutes for safe recovery of the crew module, and fire suppression systems.[23] The Defence Food Research Laboratory (DFRL) has worked on space food for the crew and has conducted trials on a G-suit for astronauts as well.[24][25] A prototype called the Advanced Crew Escape Suit weighing 13 kg and built by Sure Safety (India) Private Limited has been tested and performance verified.[26][27][28][29] While the crew module is designed to carry a total of three passengers, the maiden crewed mission may only have one or two crewmembers on board.[30]

Approval of the programme

[edit]

All preliminary tests being successful,[31] the decisive push for the creation of the Human Spaceflight Programme (HSP) took place in 2017,[32] and it was accepted and formally announced by Prime Minister Narendra Modi on 15 August 2018.[33] The funding is approximately Rs 10,000 crore. The testing phase was expected to begin in December 2020, and the first crewed mission was to be undertaken in December 2021.[34] However, on 11 June 2020, it was announced that the overall schedule for the Gaganyaan launches had been postponed due to the impact of the COVID-19 pandemic in India, in turn revising the timetable for the HSP.[35] As of December 2022, the first uncrewed test flight is scheduled to launch no earlier than mid-2024,[14] with the uncrewed second and crewed third flights to follow afterward.[13]

As per ISRO, the initial review process is complete for food, potable water, emergency first aid kits, and health monitoring systems for the Gaganyaan programme through 16 March 2021.[36] ISRO and the CNES joint working group on the HSP are collaborating on space medicine for the programme.[37] India has also maintained long-standing space relationship with Russia, like examples of international friendship and cooperations with ROSCOSMOS.[38] Four new Indian astronauts for the first human mission trained at Russia's Yuri Gagarin cosmonaut training center, experts were dispatched to the center for an exchange program, and the two countries have an agreement for developing the mission's technology.[39][40]

Progress in personal affairs

[edit]

On 4 August 2024, ISRO, NASA and SpaceX announced that an Indian astronaut, Shubhanshu Shukla, would serve as a pilot on board Axiom Mission 4, a private Crew Dragon mission to the International Space Station (ISS). He became the second-ever Indian to travel to space, first Indian space tourist, with the express goal of gaining experience for future ISRO missions.[41] The mission was launched on 25 June 2025.[42] At the 9th meeting of the India-USA Civil Space Joint Working Group, proposal for future Gaganyaan Docking to the International Space Station and joint development of EVA and EMU suits as well as ccollaborations in Space medicine and LEO and lunar mission management control are expected to be discussed.[43]

Spacecraft development

[edit]
Gaganyaan launch schedule[14][44][45]
Mission Launch date Crew Launch vehicle Duration Goal Status
Gaganyaan-1 Q4 2025[2][46] N/a LVM3 2 days Technology demonstration Under integration and testing
Gaganyaan-2 NET 2026[13][46] Technology demonstration mission carrying Vyommitra, the humanoid robot Planned
Gaganyaan-3 NET 2026 [13][46][3] Technology demonstration with Vyommitra Planned
Gaganyaan-4 NET 2027 [47] India Shubhanshu Shukla[48]
India TBD[49]
TBD First crewed flight Planned
Gaganyaan development timeline

The first phase of the programme is to develop and fly the 3.7 t (8,200 lb) Gaganyaan spacecraft with the capacity to carry a three-member crew to LEO and safely return to Earth, after a mission duration of a few orbits to two days.[45] The extendable version of the spacecraft will allow flights up to seven days, and have rendezvous and docking capability. Before the flight of the Gaganyaan module, Group Captain Shubhanshu Shukla flew on the Axiom-4 mission to the ISS.[50][51]

In the next phase, the development of a small habitat is planned, allowing spaceflight durations of 30–40 days. Further advances based on experience have the goal of developing a space station.[52]

On 7 October 2016, Vikram Sarabhai Space Centre Director K. Sivan stated that ISRO was gearing up to conduct a critical crew bailout test called the Pad Abort Test to see how fast and effectively the crew module could be released safely in the event of an emergency. The tests were conducted successfully on 5 July 2018, at Satish Dhawan Space Centre on Sriharikota. This was the first of a series of tests to qualify the launch escape system.[53][54] Parachute tests were scheduled before the end of 2019, and multiple in-flight abort tests were planned starting mid-2020.[55][needs update]

India will not use any animals for life support system testing, but robots resembling humans instead.[56][57] ISRO is targeting more than 99.8% reliability for its launch escape system.[58]

ISRO plans to launch its crewed orbiter Gaganyaan atop a Launch Vehicle Mark 3 (LVM3).[15] About 16 minutes after lift-off, the rocket will inject the orbital vehicle into an orbit 300 to 400 km above Earth. The capsule will return for a splashdown in the Arabian Sea near the Gujarat coastline.[59] As of May 2019, the design of the crew module was complete.[60] The spacecraft will be flown twice uncrewed for validation before conducting a crewed spaceflight.[61][62][63] As of January 2020, the crew module was due to undergo testing in the wind tunnel facility of the Council of Scientific and Industrial Research (CSIR) at the National Aerospace Laboratories (NAL).[64] The spacecraft will carry one crewmember in its maiden crewed mission to an orbit of 400 km (250 mi).[30]

The first uncrewed flight will involve the launch of a 5,000 kg (11,000 lb) module which, after orbiting will re-enter the atmosphere and decelerate at an altitude of 7 km (4.3 mi) before splashing down.[65]

Infrastructure development

[edit]

Launch pad

[edit]
Second Launch Pad of the Satish Dhawan Space Centre

India's maiden crewed mission is expected to take off from the Satish Dhawan Space Centre's Second Launch Pad. In November 2019, ISRO sought out contractors for augmenting the pad.[66][67][68][69][70] A third launch pad in Sriharikota has been proposed for India's future launch vehicles and crewed missions.[71] Systems for crew ingress and egress, an access platform, recovery setup for emergencies during the flight's ascent phase, and a module preparation facility for assembly and testing will be built. All the facilities will be connected to an upcoming Gaganyaan control facility which will be built nearby to facilitate communication and monitor the crew capsule during flight.[72]

Human-rating of LVM3

[edit]
2D representation of ISRO's human-rated LVM3 (HLVM3)

Human-rating certifies that a system is capable of safely transporting humans. ISRO will launch three missions to validate the human rating of the LVM3.[3][73] Existing launch facilities will be upgraded to carry out launches under the HSP campaign.[74][75]

ISRO has been modifying propulsion modules of various stages of the rocket for human rating. Theoretical parameters for human rating were expected to be achieved by August or September 2020 to be followed by simulations and three test launches.[76][needs update]

Certification

[edit]

ISRO is developing its own criteria to certify its spacecraft that will take humans to space.[77]

Communication

[edit]

The spacecraft is expected to communicate with ISTRAC and other partner antennae. For the initial test flights, terminal ships will be placed in the Pacific and Atlantic oceans to communicate with the spacecraft.[78][79] A joint facility, managed by the Australian Space Agency and ISRO has been set up at the Cocos Islands to track the spacecraft during the Orbital Insertion phase.[80][81] ISRO is planning to place chartered ships carrying a group of eight scientists to be stationed at observation points in the Pacific Ocean and the North Atlantic Ocean, to monitor the uncrewed mission. A consignment with a shipborne terminal (SBT), electronic equipment, MV-SAT antennas and its associated subsystems will be sent abroad from ISTRAC for deployment on these chartered ships. This is similar to what was done for the launch of the Mars Orbiter Mission.[82][83][84]

Future flights are expected to also be SATCOM capable, talking to Indian geostationary communication satellites, as well as the planned IDRSS constellation. ISRO has also integrated communications with Amazon Web Services ground terminals and ESTRACK in Sweden. Feeder stations for the IDRSS constellation have been built at Byalalu and Shriharikota. Additinal support will be provided by multiple Indian Naval stations and the GSAT communication satellites.The SPADEX and SARAL satellites have been used to test the ground communication networks.[85][86]

Astronauts

[edit]

Experiments and objectives

[edit]

On November 7, 2018, ISRO released an Announcement of Opportunity seeking proposals from the Indian science community for microgravity experiments that could be carried out during the first two uncrewed Gaganyaan flights.[87][88] The scope of the experiments is not restricted, and other relevant ideas will be entertained. The proposed orbit for microgravity platform is expected to be in LEO at approximately 400 km altitude. All the proposed internal and external experimental payloads will undergo thermal, vacuum and radiation tests under the required temperature and pressure conditions. To carry out long-duration microgravity experiments, a satellite may be placed in orbit. Astronauts will perform four biological and two physical science experiments related to microgravity during the mission.[89]

As of October 2021, ISRO selected five science experiments that will be conducted on Gaganyaan. The payloads will be developed by the Indian Institute of Space Science and Technology (IIST), University of Agricultural Sciences, Dharwad (UASD), Tata Institute of Fundamental Research (TIFR), IIT Patna, Indian Institute of Chemical Technology (IICT) and the Jawaharlal Nehru Centre for Advanced Scientific Research (JNCASR). Out of the five, two are biological experiments that will be conducted by IIST, UASD and TIFR and will include kidney stone formation and Sirtuin 1 gene marker effects in Drosophila melanogaster. IIT Patna will run experiments on a heat sink that can handle very high heat flux, IICT will study crystallization phenomena, and JNCASR will examine fluid mixing characteristics.[90]

With an emphasis on microgravity research, space biomanufacturing, bioastronautics, and astrobiology, the Department of Biotechnology and the ISRO have signed a memorandum of understanding (MoU) on 25 October 2024 to collaborate on space biotechnology research. The application will be in ISRO's human space flight project, Gaganyaan. The MoU will address problems like food storage, radiation, microgravity, and constant nutrient supply, as well as health risks like cancer, cataracts, and loss of bone and muscle.[91]

Space station

[edit]

India plans to deploy Bharatiya Antariksha Station, a 52-tonne space station,[3] as a follow-up programme to the Gaganyaan missions. On June 13, 2019, ISRO Chief K. Sivan announced that India's space station will be deployed 5–7 years after the completion of the Gaganyaan programme, and that India will not join the International Space Station program. It is expected to be placed in an LEO of 400 km altitude, hosting a crew of three for 15–20 days. Final approval is expected to be given to the programme by the Indian government only after the completion of the Gaganyaan missions.[92][93][94][95]

ISRO is working to develop spacecraft docking and berthing technology, with an initial funding of ₹10 crore cleared in 2017.[96] A Space Docking Experiment, or SpaDeX, is under development, featuring signal analysis equipment, a high-precision videometer for navigation, docking system electronics and real-time decision making for landing systems. As part of the experiment, ISRO launched two small satellites for testing. This technology is crucial for a space station as it will enable the docking of spacecraft.[97]

See also

[edit]

References

[edit]
  1. ^ "Scientists Discuss Indian Manned Space Mission". Archived from the original on 13 April 2021. Retrieved 13 January 2020.
  2. ^ a b c "Gaganyaan launch delayed: Manned mission now in 'fourth quarter of 2024'". Times of India. 21 December 2022. Retrieved 15 February 2023.
  3. ^ a b c d e "Prime Minister reviews readiness of Gaganyaan Mission".
  4. ^ "Gaganyan: How to send an Indian into space". Indian Express. 16 August 2018.
  5. ^ a b "Eleventh Five year Plan (2007–12) proposals for Indian space programme" (PDF). Archived from the original (PDF) on 12 May 2013. Retrieved 21 June 2013.
  6. ^ "Crew module Atmospheric Re-entry Experiment (CARE) - ISRO". Archived from the original on 16 August 2022. Retrieved 19 September 2022.
  7. ^ "Satellites Are Our Priority Now, Not Human Space Flight". Outlook. Retrieved 21 July 2017.
  8. ^ "ISRO's first 'pad abort' test, critical for future human space mission, successful". The Hindu. 5 July 2018.
  9. ^ "Indian Astronaut Will Be In Space For 7 Days, Confirms ISRO Chairman". NDTV. Archived from the original on 27 August 2025.
  10. ^ Singh, Surendra (29 December 2018). "Rs 10,000 crore plan to send 3 Indians to space by 2022". The Times of India. Retrieved 29 December 2018.
  11. ^ Indians To Spend 7 Days In Space In Rs. 10,000 Crore Gaganyaan Plan: 10 Points, NDTV, 28 December 2018.
  12. ^ Suresh, Haripriya (15 August 2018). "JFK in 1961, Modi in 2018: PM announces 'Indian in space by 2022,' but is ISRO ready?". The News Minute.
  13. ^ a b c d Ramesh, Sandhya (4 December 2022). "India's first human spaceflight Gaganyan in limbo, astronauts partially trained, ISRO silent". ThePrint. Retrieved 6 December 2022.
  14. ^ a b c Kumar, Chethan (22 July 2021). "Gaganyaan 1st uncrewed mission unlikely before June 2022; no life support systems testing". The Times of India. Retrieved 23 July 2021.
  15. ^ a b "First human-rated test flight for India's Gaganyaan not likely in 2021". The Tribune. 1 July 2021. Archived from the original on 29 October 2021. Retrieved 1 July 2021.
  16. ^ "India's space journey: Interactive timeline and infographics". The Hindu. Retrieved 17 November 2025.
  17. ^ "India eying an indigenous station in space". The Hindu Business Line. 13 June 2019. Retrieved 13 June 2019.
  18. ^ Dutt, Anonna (18 September 2020). "Gaganyaan mission: Astronauts to undergo ISRO module next year". New Delhi. Archived from the original on 30 May 2022. Retrieved 21 September 2020.
  19. ^ Srinivasan, Pankaja (4 April 2010). "The down to earth Rakesh Sharma". The Hindu. Archived from the original on 24 July 2015. Retrieved 5 April 2014.
  20. ^ "ISRO considering manned space mission: Nair". The Hindu. Chennai, India. 9 August 2007.
  21. ^ "ISRO plans manned mission to moon in 2014". Business Standard.
  22. ^ "India announces first manned space mission". BBC. 27 January 2010
  23. ^ "Gaganyaan: DRDO to provide special space food and emergency survival kit for ISRO's manned mission". The Financial Express. 4 March 2020. Retrieved 6 March 2020.
  24. ^ "Def lab works on food for spaceflight crew". The New Indian Express. Retrieved 18 August 2018.
  25. ^ "Dosa or dum aloo. What will India's first astronauts eat?". DNA. 19 March 2010. Retrieved 18 August 2018.
  26. ^ "Ahmedabad DNA G & G [PG 16] : Vadodara-based company develops space suit for ISRO". epaper.dnaindia.com. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  27. ^ "Gujarat's firms helping ISRO shape up 'manned space mission'". The Indian Express. 3 November 2015. Retrieved 18 August 2018.
  28. ^ Gujarat's Firm Develops India's First Space Suit for ISRO | Make in India, IndiaTV, 12 February 2016, retrieved 18 August 2018
  29. ^ "Government of India, Department of Space, Unstarred Question number 213 Lok Sabha" (PDF). 16 November 2016. Archived from the original (PDF) on 18 August 2018. Retrieved 19 August 2018.
  30. ^ a b Anonna Dutt (8 January 2020). "India's first manned mission Gaganyaan may take 1 astronaut". Hindustan Times. Retrieved 13 January 2020.
  31. ^ "ISRO to send first Indian into Space by 2022 as announced by PM, says Dr Jitendra Singh" (Press release). Press Information Bureau, Government of India. Department of Space. 28 August 2018.
  32. ^ Rao, Mukund Kadursrinivas; Murthi, Sridhara K. R.; S., Prasad M. Y. (5–29 September 2017). "The Decision for Indian Human Spaceflight Programme – Political Perspectives, National Relevance and Technological Challenges" (PDF). NIAS Repository. 68th International Astronautical Congress (IAC). International Astronautical Federation.
  33. ^ "Indian will take national flag to space on board Gaganyaan by 2022, says PM Narendra Modi in Independence Day speech". Hindustan Times. 15 August 2018.
  34. ^ "Cabinet Okays ISRO's Human Spaceflight Programme for Rs 10,000 Crore". The Wire. Retrieved 30 December 2018.
  35. ^ Kumar, Chethan (11 June 2020). "Gaganyaan mission: No Gaganyaan unmanned flight this year". The Times of India. Retrieved 13 June 2020.
  36. ^ "Gaganyaan: DRDO to provide special space food and emergency survival kit for ISRO's manned mission". The Financial Express. 4 March 2020. Retrieved 25 June 2025.
  37. ^ "India, France Working On 3rd Joint Space Mission, Says ISRO Chairman". NDTV. 20 March 2021. Retrieved 21 March 2021.
  38. ^ aniruddh (25 January 2020). "Gaganyaan gives a boost to India-Russia space partnership". IndBiz | Economic Diplomacy Division. Retrieved 17 November 2025.
  39. ^ "Astronauts on Isro's Gaganyaan mission trained at same centre in Russia where Rakesh Sharma underwent training". The Times of India. 27 February 2024. ISSN 0971-8257. Retrieved 17 November 2025.
  40. ^ "Gaganyaan Mission: How 4 Indian astronauts were trained in Russia - Gaganyaan astronauts named". The Economic Times. Retrieved 17 November 2025.
  41. ^ Foust, Jeff. "Hungary and Poland to join India on Ax-4". SpaceNews. Retrieved 18 February 2025.
  42. ^ "Live coverage: SpaceX to launch fourth commercial Axiom mission to the space station". 25 June 2025.
  43. ^ "India, US moot Gaganyaan uncrewed docking with ISS; 9th working group meeting to chalk out more details". The Times of India. 20 February 2026. ISSN 0971-8257. Retrieved 20 February 2026.
  44. ^ Department of Space (10 February 2021). "Training of Astronauts and Progress of Gaganyaan Mission". Press Information Bureau. Delhi. Retrieved 11 February 2021.
  45. ^ a b Singh, Surendra (11 November 2021). "COVID stalled Gaganyaan project, manned mission will finally be launched in 2023: ISRO Chief". The Times of India. Retrieved 23 November 2021.
  46. ^ a b c "Exclusive: No Gaganyaan unmanned flight this year". The Week.
  47. ^ "Gaganyaan Scheduled for 2026, Chandrayaan-4 to Launch by 2028: ISRO". Gadgets 360. 28 October 2024. Retrieved 31 October 2024.
  48. ^ "India's Path to Space: Group Captain Shukla Commands Gaganyaan | Headlines". Devdiscourse. Retrieved 25 June 2025.
  49. ^ "ISRO yet to take call on number of astronauts". The Tribune. Retrieved 9 June 2025.
  50. ^ The Hindu Bureau (2 August 2024). "India selects two astronaut-designates for upcoming Axiom-4 mission to International Space Station". The Hindu. ISSN 0971-751X. Retrieved 2 August 2024.
  51. ^ "Nasa to launch India's Group Captain Shubhanshu Shukla to Space Station". India Today. 2 August 2024. Retrieved 2 August 2024.
  52. ^ "We're talking of habitation on moon, Mars ... we have to know how to adapt: ISRO Chief K. Sivan". The Indian Express. 19 January 2019. Retrieved 29 September 2025.
  53. ^ "Successful flight testing of crew escape system technology demonstrator - ISRO". www.isro.gov.in. Archived from the original on 5 July 2018. Retrieved 5 July 2018.
  54. ^ "ISRO's first 'pad abort' test, critical for future human space mission, successful". The Hindu. 5 July 2018. ISSN 0971-751X.
  55. ^ "Episode 90 – An update on ISRO's activities with S Somanath and R Umamaheshwaran". AstrotalkUK. 24 October 2019. Retrieved 30 October 2019.
  56. ^ "ISRO Not To Fly Living Being Before Actual Manned Space Mission: Official". NDTV.com. Retrieved 16 September 2018.
  57. ^ "Before humans, 'humanoids' to do experiments in space". The Times of India. 18 January 2019. ISSN 0971-8257.
  58. ^ "Suits from Vadodara, parachutes from Agra: Inside ISRO's plan to launch India's first astronauts".
  59. ^ Peri, Dinakar (28 August 2018). "Manned space mission before 75th I-Day: ISRO chief". The Hindu. ISSN 0971-751X. Retrieved 29 August 2018.
  60. ^ "India's first solar mission in 2020: ISRO chairman". The Times of India. 4 May 2019. Retrieved 5 May 2019.
  61. ^ "ISRO to launch two unmanned space missions in 2020 and 2021". All India Radio. 18 January 2019. Archived from the original on 17 July 2020. Retrieved 5 May 2019.
  62. ^ "ISRO to build 3 sets of rockets, crew modules for Gaganyaan". The Times of India. 30 December 2018. Retrieved 5 May 2019.
  63. ^ "ISRO to use a humanoid, not animal, for Gaganyaan tests". The Times of India. 18 January 2019. Retrieved 5 May 2019.
  64. ^ Shimona Kanwar (11 January 2020). "Gaganyaan to be tested in wind tunnel facility of CSIR laboratory". The Times of India. Retrieved 13 January 2020.
  65. ^ Anantha Krishnan M (11 November 2020). "Gaganyaan Unplugged-7: ADRDE recovery system to play critical role during India's manned mission". On Manorama. Bengaluru. Retrieved 11 November 2020.
  66. ^ "SDSC SHAR/Sr.HPS/PT/RO/11/2019-20". www.isro.gov.in. Indian Space Research Organization. 7 November 2019. Archived from the original on 8 November 2019. Retrieved 22 November 2019.
  67. ^ "RFP to Realise Hydrant System for Augmented Facilities at SLP Complex (ASLP) SDSC, Shar Sriharikota" (PDF). www.isro.gov.in. Indian Space Research Organization. 7 November 2019. Archived from the original (PDF) on 12 October 2020. Retrieved 22 November 2019.
  68. ^ "Work Contract to carry out Video & Still Photography documentation coverage and Video Editing Works of Technical Photography Facility" (PDF). www.isro.gov.in. Indian Space Research Organization. 7 November 2019. Archived from the original (PDF) on 8 November 2019. Retrieved 22 November 2019.
  69. ^ "Supply of Raw Material, Fabrication, Erection and Commissioning of Structural Elements for Gaganyaan Mission at Umbilical Tower of Second Launch Pad (SLP)" (PDF). ISRO. 7 November 2019. Archived from the original (PDF) on 12 October 2020. Retrieved 22 November 2019.
  70. ^ "Realisation of New Hydraulic System for Crew Access Arm (CAA) & Augmentation/Modification of Existing SCVRP-3 Hydraulic System for Servicing Gaganyaan Mission at Umbilical Tower (UT) of Second Launch Pad (SLP)" (PDF). ISRO. 7 November 2019. Archived from the original (PDF) on 15 October 2020. Retrieved 22 November 2019.
  71. ^ "ISRO to begin process for Human Space Flight Mission". PTI. Hyderabad. India Today. 26 January 2010. Retrieved 22 November 2019.
  72. ^ "Mission Gaganyaan: A small stepway for man, a giant leap for India". The Times of India. ISSN 0971-8257. Retrieved 1 April 2024.
  73. ^ "ISRO to build 3 sets of rockets, crew modules for Gaganyaan". The Times of India. 30 December 2018. Retrieved 30 December 2018.
  74. ^ "India's human space programme gets a fillip". Retrieved 11 January 2019. Initially, the plan was the construct a new launch pad for the human space flight, but Sivan told the Express that due to paucity of time one of the two existing launch pads is being modified to meet the requirement.
  75. ^ "Question number 1733 in Rajya Sabha" (PDF). Archived from the original (PDF) on 16 April 2023. Retrieved 11 January 2019. It is proposed to utilise the existing launch pad with augmentation for carrying out the initial flights under the Gaganyaan manned space flight programme.
  76. ^ Kumar, Chethan (29 February 2020). "Gaganyaan: ISRO designs new vehicle to test crew escape systems". The Times of India. Retrieved 2 March 2020.
  77. ^ "ISRO to develop indigenous method to certify spacecraft". The New Indian Express. 8 January 2024. Retrieved 8 January 2024.
  78. ^ "Gaganyaan mission: ISRO gives good news, mission to be launched in..., plan includes..." India.com. 25 November 2024. Retrieved 25 November 2024.
  79. ^ "Gaganyaan's Unmanned Mission May Go To Space Next March, ISRO Ships To Track From Pacific, Atlantic Oceans". News18. Retrieved 25 November 2024.
  80. ^ Madanapalle, Aditya (25 February 2026). "ISRO antenna for Gaganyaan programme reaches Cocos Islands in Australia". News9live. Retrieved 26 February 2026.
  81. ^ Science Desk, India Today (27 February 2026). "Australia joins hands with Isro to support Gaganyaan: How will it help astronauts?". India Today. Retrieved 28 February 2026.
  82. ^ "Gaganyaan's Unmanned Mission May Go To Space Next March, ISRO Ships To Track From Pacific, Atlantic Oceans". News18. Retrieved 25 November 2024.
  83. ^ Livemint, Livemint (25 November 2024). "Gaganyaan's unmanned mission likely in March next year; ISRO to track from Pacific, Atlantic oceans". Livemint. Retrieved 25 November 2024.
  84. ^ "Gaganyaan mission: ISRO gives good news, mission to be launched in..., plan includes..." India.com. 25 November 2024. Retrieved 25 November 2024.
  85. ^ Kumar, Chetan (1 May 2026). "Isro validates Amazon Web Services, ESA comms links for Gaganyaan". The Times of India. ISSN 0971-8257. Retrieved 2 May 2026.
  86. ^ Tripathi, Sibu (1 May 2026). "Isro reveals Gaganyaan astronaut training details: What's ready, what's pending". India Today. Retrieved 2 May 2026.
  87. ^ "Announcement of Opportunity (AO) for Low Earth Orbit based Microgravity Experiments - ISRO" (PDF). Archived from the original on 21 November 2018. Retrieved 22 January 2019.
  88. ^ "Human Mission: ISRO looking at pool of 10 experiments in space".
  89. ^ "Lok Sabha, Unstarred Question number 2259" (PDF). 4 March 2020. Archived (PDF) from the original on 5 March 2020. Retrieved 4 March 2020.
  90. ^ Kumar, Chethan (21 October 2021). "Kidney stone formation to gene marking: 5 experiments shortlisted for Isro mission; MoUs in place". The Times of India. Retrieved 26 October 2021.
  91. ^ "Gaganyaan: ISRO, Dept of Biotechnology sign MoU to boost space biotech research". Hindustan Times. 25 October 2024. Retrieved 25 October 2024.
  92. ^ Singh, Surendra (13 June 2019). "India's own space station to come up in 5–7 years: ISRO chief". The Times of India. Retrieved 24 July 2019.
  93. ^ "India's space station likel to have space for three". The Times of India. 31 October 2019. Retrieved 31 October 2019.
  94. ^ "India's space station likely to have space for three". 31 October 2019. Retrieved 1 November 2019.
  95. ^ Peri, Dinakar (13 June 2019). "India to have its own space station: ISRO". The Hindu. ISSN 0971-751X. Retrieved 1 November 2019. Giving out broad contours of the planned space station, Dr. Sivan said it has been envisaged to weigh 20 tonnes and will be placed in an orbit of 400 km above earth where astronauts can stay for 15–20 days. The time frame is 5–7 years after Gaganyaan, he stated.
  96. ^ Kumar, Chethan (2 May 2017). "ISRO: ISRO project that can aid refuel, repair of satellites in space gets push". The Times of India. Retrieved 24 July 2019.
  97. ^ Kumar, Chethan (13 June 2019). "ISRO Latest news: India has been quietly working on key technology to enable space station". The Times of India. Retrieved 24 July 2019.
[edit]