Wiki Article

Jinan Metro

Nguồn dữ liệu từ Wikipedia, hiển thị bởi DefZone.Net

Jinan Metro
Line 2 train at Beiyuan station
Line 2 train at Beiyuan station
Overview
LocaleJinan, Shandong
Transit typeRapid transit
Number of lines8 (operating)
2 (under construction)
Number of stations151 (operating)
108 (Metro lines only)
Daily ridership1,452,300 (Highest record on 31 December 2025)[1]
Annual ridership116.39 million (2024)[2]
Operation
Began operation1 April 2019; 7 years ago (2019-04-01)[3]
Technical
System length232.68 km (144.58 mi)
181.53 km (112.80 mi) (Metro lines only)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
System map
Jiyang North
Gongye Beilu
Jiyang Citizen Service Center
Jibei Primary School
Xinyuan School
Yinhe Lu
Jinan International
Airport North
Guangming Jie
Huihe
Jinan International
Airport South
Hua'erzhuang Beijie
Linkong
Qingning
Lingangbeilu
Shandong Yingcai University
North Campus
Chuanliu
Yellow River Convention
and Exhibition Center
Qujiazhuang
Cuizhai
Tantou
Wenquan Lu
Liangwang
Hehua Lu
Liangwang West
Jinandong
Railway Station
Qingyuan Dajie
Peijiaying
Xiuyuan He
Xiangquan Jie
Shandong University
Longshan
Wangsheren Lijiaoqiao
Shengjing
Huangqishan North
Huangtuya
Wangsheren
Shandong University of Finance
& Economics Zhangqiu Campus
Zhangmatun
Shandong Xiandai University
Shandong Polytechnic
Zhuangke
Jinan Maternity & Child
Care Hospital (East Area)
Chunjing Lu
Chunyuan Lu
Kechuang Cheng
Xuma
Chunbo Lu
Dazheng Lu
Suncun
Xijuye He
Caihonghu East
Jinan Innovation Zone
No. 1 Middle School
Caihong Hu
Jinan Innovation Zone
Experimental High School
Chunyi Lu
Chunhui Lu
Chunxuan Lu
Shijidadao Chunxuanlu
Shagou
Keyuan Lu
Kehang Lu
Wujiangshan East
Chunxiu Lu
Wujiazhuang
Tangxuan Lu
Tangye Donglu
Licheng Wenbo Center
Pengjiazhuang
Baoshan
Licheng No. 2 High
School Tangye Campus
Fenghuang Beilu
Zhenguan Jie
Jiangjiazhuang
Tangye
Bajianpu
Shandong Highway
Technician College
Huayuandonglu
Supercomputing Center
Dingjiazhuang
Shandong Youth University
of Political Science
Xujiazhuang
Tangye Gongyuan
Shiji Dadao
Xingcun Lijiaoqiao East
Kaituo Lu
Xingcun Lijiaoqiao West
Qilusoft Park
Wenlvcheng
Tianluo Lu
Gold Industrial Park
Zhudian
Linjiazhuang
Qilipu
Hanyu Jingu
Lishanlu
Shuntai Guangchang
Beiyuan
Aoti Donglu
Shengchanlu
Ancheng Jie
Jiluolu
Olympic Sports Center
Jinan Railway Station North
Longao Building
Yikanglu
Mengjiazhuang
Baliqiao
Longdong
Central Business District
Zhuanshan Xilu (MIXC)
Maoling Shan
Shandong Museum
Qilihelu South
Jiangshuiquan Lu
Shanda'nanlu East
Yanshan Lijiaoqiao
Shandong University
Shandalu South
Dongcang
Shanshi Donglu
Laodongmen
Qianfo Mountain
Daming Lake
Quancheng Gongyuan
Beitan
Shandong Sports Center
Jinan Railway Station
Bayi Lijiaoqiao
Jingyi Weiliu
Wuli Paifang
Xishichang
Nanxinzhuang
Laotun
Yingshi Jie
Erhuanxilu
Duandian
Shandong International
Convention & Exhibition Center
Lashan
Zhongyang Gongyuan
Lashanhe Gongyuan
Shandong Grand Theater
Lashan South
Fangte
Dayang
Jinanxi
Railway Station
Wangfuzhuang
Jinanxi Railway Station
West Square
Yufuhe
Chunfeng Yuedong Gongyuan
Zhaoying
Shandong First
Medical University
Ziweilu
Yixue Zhongxin
Daxuecheng
Mengwangzhuang
Yuanboyuan
Shandong First Medical
University West Gate
Chuangxingu
Gongyanyuan
Key
Line 1 Line 1
Line 6 Line 6
Line 2 Line 2
Line 8 Line 8
Line 3 Line 3
Jiyang line Jiyang Line
Line 4 Line 4
SkyShuttle 1 SkyShuttle Line 1

Jinan Metro (Chinese: 济南地铁; pinyin: Jǐnán Dìtiě), also known as Jinan Rail Transit (Chinese: 济南轨道交通; pinyin: Jǐnán Guǐdào Jiāotōng) is a rapid transit system serving Jinan, the capital of Shandong province, China.

History

[edit]

Planning of the system began in the early 2000s but was delayed due to 2008 world economic crisis. After years of preparation, construction started at an official ceremony on 29 December 2013. Line 1 was opened on 1 April 2019.[3]

The first phase of construction was adopted by National Development and Reform Commission and included three lines (1, 2, and 3) with 47 stations. The first phase has a total length of 96.5 kilometres (60.0 mi): 72.2 kilometres (44.9 mi) underground, 23.8 kilometres (14.8 mi) elevated, and one-half kilometre (0.3 miles) transitional. It is expected to cost up to ¥48.9 bn. Phase 1 was completed on 27 December 2025, when Lines 4, 6 and 8 opened simultaneously.[4]

The fare system is based on existing smart card technology.[5]

Lines in operation

[edit]
Line Terminals
(District)
Opened Length
in km
Stations
 1  Fangte
(Huaiyin)
Gongyanyuan
(Changqing)
1 April 2019 26.27 11
 2  Wangfuzhuang
(Huaiyin)
Pengjiazhuang
(Licheng)
26 March 2021 36.39[6] 19[6]
 3  Longdong
(Lixia)
Jichangnan (Jinan International Airport South)
(Licheng)
28 December 2019 33.67 18
 4  Shandong First Medical University
(Huaiyin)
Pengjiazhuang
(Licheng)
27 December 2025[4] 40.2 33
 6  Shandong University
(Lixia)
Liangwang
(Licheng)
27 December 2025[4] 19.5 17
 8  Xingcun Lijiaoqiao East
(Licheng)
Qingyuan Dajie
(Zhangqiu)
27 December 2025[4] 25.5 10
 Jiyang  Jiyang North
(Jiyang)
Jinandong Railway Station
(Licheng)
30 December 2025 36.1 11
 SkyShuttle Line 1  Loop line 6 December 2025 30.55 32
Total 232.68 151
Total (Metro lines only) 181.53 108

Line 1

[edit]

Line 1 runs north–south in the western part of the city. The line began operating on 1 April 2019, and cost CN¥12 billion to build.[7][3]

Line 2

[edit]

Line 2 is 36.39 kilometres (22.61 mi) in length, including a 34.8-kilometre (21.6-mile)-long underground section.[8] The line began operating on 26 March 2021.

Line 3

[edit]

Line 3 (Phase 1) is 21.592 kilometres (13.417 miles) long. It is completely underground. The line began operating on 28 December 2019.[9]

Line 4

[edit]

Line 4 is 40.3 kilometres (25.0 miles) long. The line began operating on 27 December 2025.[4]

Line 6

[edit]

Line 6 (Phase 1) is 40.1 kilometres (24.9 miles) long. The line began operating on 27 December 2025.[4]

Line 8

[edit]

Line 8 is 25.5 kilometres (15.8 miles) long. The line began operating on 27 December 2025.[4]

Jiyang Line

[edit]

The Jiyang Line is 36.1 kilometres (22.4 miles) long, running from Jinan East railway station to the Jiyang district. The line began operating on 30 December 2025.[10]

SkyShuttle Line 1

[edit]

Jinan SkyShuttle Line 1 runs in a loop in the eastern part of the city. The fully elevated line using a BYD SkyShuttle automated guideway transit system began operating on 6 December 2025. It is 30.55 km in length with 32 stations.[11][12]

Future Development

[edit]
Phase 2 Construction Plan[13]

Phase 2 was approved by the National Development and Reform Commission on 30 October 2020. Phase 2 consists of 159.6 km of new subway and is proposed to start construction in 2020.[14]

Line Terminals
(District)
Opening
Date
Length
in km
Stations Status
 3  Jichangnan Jichangbei 2027 3.3 1 Under Construction
 6  Weilizhuang Liangwang 2026-2027 (Full) 40.1[15] 33 Under Construction[15]
 7  Jinanbei Railway Station Fenghuang Nanlu 2028 30.0 22 Under Construction[16]
 9  Huanghe Nan'an Maozhuang 2027 14.8 11 Under Construction

Rolling stock

[edit]

Lines 1, 2, and 3 use Type B rolling stock. Lines 2 and 3 have six-car trains, whereas Line 1 has four-car trains with provision for an increase to six-car trains in the future. Lines 4, 6 and 8 use high capacity type A rolling stock.[13]

Lines 7 and 9 will use high capacity Type A rolling stock like the lines 4, 6 and 8.[13]

See also

[edit]

References

[edit]
  1. ^ "145.2万人次!济南地铁单日客流首破百万大关". 1 January 2026.
  2. ^ "2024年城市轨道交通运营数据速报". 15 January 2025.
  3. ^ a b c "济南轨道交通1号线商业运营首班车6:00在工研院站和方特站同步对向始发_山东各地 _山东新闻_新闻_齐鲁网". news.iqilu.com.
  4. ^ a b c d e f g "China's first subway through karst spring area becomes operational". english.news.cn. Retrieved 28 December 2025.
  5. ^ "smart-cards". Archived from the original on 14 January 2014. Retrieved 13 January 2014.
  6. ^ a b "温馨提示". news.e23.cn.
  7. ^ 20131229济南新闻 济南轨道交通市域快线建设启动 (in Simplified Chinese). Jinan TV (济南电视台). 29 December 2013.
  8. ^ "济南轨道交通2号线3月26日开通初期运营". 25 March 2021.
  9. ^ "定了!济南地铁3号线12月28日正式通车". sd.ifeng.com.
  10. ^ "明日10时,济南轨道交通济阳线开通运营". dzrb.dzng.com. Retrieved 29 December 2025.
  11. ^ "济南云巴开通运营 全长30.55公里起步价2元". Xinhua Net.
  12. ^ "济南云巴通车首日 "尝鲜"市民排起队".
  13. ^ a b c "济南市城市轨道交通第二期建设规划(2020~2025 年)" (PDF).
  14. ^ "济南轨道交通二期规划获批 6条线路总投资1154.36亿元_今日头条_大众网". jinan.dzwww.com. Retrieved 31 October 2020.
  15. ^ a b "轨道交通6号线开启济南轨道交通二期规划新篇章". 30 September 2021.
  16. ^ "济南轨道交通7号线开工 目前6条地铁同时在建-新华网山东频道". sd.news.cn. Retrieved 16 December 2022.
[edit]